After 3 years at 140 Cambridge Science Park, DisplayLink were looking for design and project management services for their relocation to a brand new 60K sqft building at 220 CSP. The requirements were to build on our previous design while creating a more corporate space reflecting their business development. After workshopping the brief we developed the design to provide a natural warmer palette for a flexible office space supporting changing team sizes, collaboration and concentration. The ground floor provides a catered breakout facility as well as training and welfare spaces with the first and second floors of the building dedicated to office areas, meeting spaces, labs and workshops. Part of the ground floor has also been designed and fitted out as a self-contained sublet, ensuring space is used as efficiently as possible. We designed the space to RIBA Stage 3, with the successful tenderer providing the construction drawings as required, and we also maintained a watching brief through the construction to safeguard design intent.
Project Details
Cambridge
- Design
- Project Management
- Client
DisplayLink - Date
December 2019 - Info
60,000 sq ft in Cambridge, CSP